Receiving Module Go-Live Checklist

Overview

Use this checklist before going live with the Receiving module. All items must pass or have approved exceptions.

Module: Receiving Prepared By: _______________ Target Go-Live: _______________


1. Data Migration

Item Master

  • All items loaded
  • Item descriptions correct
  • UOM (unit of measure) set
  • Barcode data loaded
  • Catch weight flags set

Sign-off: _______________ Date: _______________

Vendor Master

  • All vendors loaded
  • Vendor codes correct
  • Lead times set
  • Contact info loaded

Sign-off: _______________ Date: _______________

Customer Configuration

  • WHCODE set correctly
  • Expiration day rules loaded
  • Warning thresholds set
  • Override permissions set

Sign-off: _______________ Date: _______________


2. Functional Testing

WF-001: Standard PO Receiving

  • Can open a PO
  • Can enter quantities
  • Date validation works
  • Overage handling works
  • Shortage handling works
  • Damage entry works
  • Labels print correctly

Sign-off: _______________ Date: _______________

WF-002: UCI Barcode Receiving

  • Scanner connects
  • Barcode parses correctly
  • Item lookup works
  • Date extracts correctly
  • PO linking works

Sign-off: _______________ Date: _______________

WF-003: Super PO

  • Can create Super PO
  • Can add multiple items
  • Single LP generated
  • Label shows all items

Sign-off: _______________ Date: _______________

WF-005: No-PO Receiving

  • Reason codes work
  • Manager override works
  • Records created correctly

Sign-off: _______________ Date: _______________


3. Integration Testing

Label Printers

  • Printer 1 connected and working
  • Printer 2 connected and working
  • Backup printer tested
  • Label format correct

Sign-off: _______________ Date: _______________

Barcode Scanners

  • All scanners configured
  • Scanner 1 tested
  • Scanner 2 tested
  • Spare scanner ready

Sign-off: _______________ Date: _______________

ERP Integration

  • PO sync working
  • Receipt data flows to ERP
  • Inventory updates sync
  • Error handling tested

Sign-off: _______________ Date: _______________


4. Configuration Validation

Feature Flags

Flag Expected Actual OK?
UCI_ENABLED Yes
CATCH_WEIGHT Yes
AUTO_LP Yes
DATE_WARNING 30
DATE_ALERT 45

Sign-off: _______________ Date: _______________

User Permissions

  • Receiving Clerk role created
  • Supervisor role created
  • Override permissions set
  • Test users can log in

Sign-off: _______________ Date: _______________


5. User Acceptance Testing

End User Tests

  • Receiving Clerk 1 completed test
  • Receiving Clerk 2 completed test
  • Supervisor completed test
  • All defects resolved or deferred

Sign-off: _______________ Date: _______________

Training Complete

  • All receiving staff trained
  • Quick reference cards distributed
  • Support contacts posted
  • Trainer available for go-live

Sign-off: _______________ Date: _______________


6. Performance Validation

Response Time

Action Target Actual OK?
Open PO <2 sec
Save line <1 sec
Print label <3 sec
Barcode parse <1 sec

Sign-off: _______________ Date: _______________

Load Test

  • 10 concurrent users tested
  • Peak volume simulated
  • No errors under load

Sign-off: _______________ Date: _______________


7. Go-Live Approval

Blockers

List any blocking issues:

Issue Owner Status

Deferred Items

List items deferred to post-go-live:

Item Reason Target Date

Final Approval

Role Name Signature Date
QA Lead
Project Manager
Business Owner
IT Manager

Go-Live Contacts

Role Name Phone
Project Lead
IT Support
Vendor Support

Post Go-Live Checklist

Day 1:

  • Monitor first receives
  • Check for errors in log
  • Verify ERP sync
  • Support staff on floor

Week 1:

  • Daily error review
  • User feedback collection
  • Performance monitoring
  • Issue tracking